Installation Guide
How to Install Lensun Solar Panels
Step-by-step installation guides for hood solar panels, flexible panels and portable systems — with real video tutorials from Lensun and independent creators.
6
Install Steps
5+
Video Guides
50+
Vehicle Models
Step 1 — Surface Preparation (5 min)
- Wash hood surface with isopropyl alcohol (IPA 70%+) — remove all wax and grease
- Let dry completely — 10 minutes minimum in warm weather
- Measure panel dimensions against hood and mark edges with masking tape
- Pro Tip: Use a clean microfiber cloth with IPA. Avoid paper towels — they leave lint that ruins adhesion.
Step 2 — Panel Placement (10 min)
- Dry-fit the panel (no adhesive) — confirm it lies flat with no gaps larger than 3mm
- Center the panel left-right using masking tape guidelines
- Ensure panel does not overhang hood edges — leave 15mm margin minimum
- Mark final position with masking tape corners before removing panel
Step 3 — Adhesive Mounting (15 min)
- Apply VHB tape strips to the back of the panel (included in kit)
- Peel backing halfway on each tape strip before positioning
- Align panel to masking tape marks and press firmly — start from center outward
- Apply pressure along full surface for 60 seconds minimum
- Allow 24-hour full cure before driving — 72 hours recommended
- Pro Tip: Ideal mounting temperature: 15°C–38°C. Below 10°C the adhesive will not bond properly.
Step 4 — Cable Routing (20 min)
- Route cable along hood crease to minimize visibility
- Use included cable clips or self-adhesive cable tie bases
- Pass cable through firewall using existing grommets (no drilling required)
- Leave 100mm of slack at hood-body junction for hinge movement
- Seal all cable entry points with self-amalgamating tape or silicone
Step 5 — MPPT Controller Wiring (30 min)
- Connect panel cable to MPPT controller PV input (check polarity first)
- Connect MPPT output to battery — positive first, negative second
- Set battery type on MPPT (AGM/LiFePO4/Gel) before first connect
- Add inline fuse between MPPT and battery (within 150mm of battery)
- Pro Tip: Never connect/disconnect battery while panel is in sunlight — disconnect panel first.
Step 6 — System Test (10 min)
- Check MPPT display shows panel wattage in direct sunlight
- Verify battery charging current on controller display
- Perform a hood flex test — open and close hood 10 times, check cable slack
- Register your warranty at lensunsolar.com
- Expected output: In full sun, a 100W panel should show 70–90W on MPPT display.
Need Help with Your Install?
Our technical team responds within 24 hours. Include your vehicle model, panel series, and a photo of the issue.
Contact Technical Support